• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 10. Positioning Forklift Entering Power Box.
Figure 12. Top Power Box Mount Bolts.

TECHNICAL MANUAL FOR MULTI-TEMPERATURE REFRIGERATED CONTAINER SYSTEM
Page Navigation
  874    875    876    877    878  879  880    881    882    883    884  
img
.
TM 10-8145-222-23
0084
REPAIR CONTINUED
12. Remove four bolts (Figure 11, Item 1), lock washers (Figure 11, Item 2), and washers (Figure 11, Item 3)
securing bottom of power box (Figure 11, Item 4) to container wall (Figure 11, Item 5).
Figure 11. Bottom Power Box Mount Bolts.
0084-14


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.