• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 12. Top Power Box Mount Bolts.
Figure 15. Removing TR1-X0 Wires

TECHNICAL MANUAL FOR MULTI-TEMPERATURE REFRIGERATED CONTAINER SYSTEM
Page Navigation
  876    877    878    879    880  881  882    883    884    885    886  
img
.
TM 10-8145-222-23
0084
REPAIR CONTINUED
16. Use three persons to lift power box (Figure 13, Item 1) off of forklift and lay power box on work bench with door
(Figure 13, Item 2) facing up.
Figure 13. Power Box Removal.
17. Open power box door (Figure 14, Item 1) as far as possible and support door open using one Soldier/personnel.
Figure 14. Power Box Door.
0084-16


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.