|
|
CAUTION. NEVER ADJUST THE EXPANSION VALVE UNLESS IT IS ABSOLUTELY NECESSARY. WHEN ADJUST-
ING THE EXPANSION VALVE. ALLOW AT LEAST 20 MINUTES BETWEEN EACH ADJUSTMENT. THIS
TlME ELEMENT IS VERY IMPORTANT AND MUST BE OBSERVED.
ADJUSTMENT
STEP 1. TAPE THE BULB OF A THE THERMOMETER TO SUCTION TUBE NEAR SENSING ELEMENT. INSULATE
THERMOMETER BULB.
STEP 2. INSTALL A SUITABLE PRESSURE GAGE AT SUCTION TUBE SERVICE VALVE (PAR. 5-20).
STEP 3.
MUST STABILIZE).
STEP 4. CHECK THERMOMETER AND PRESSURE GAGE READINGS. COMPARE READINGS WITH FIGURE 5-14
THERMOMETER READING SHOULD BE APPROXIMATELY 10 F HIGHER THAN TEMPERATURE
GIVEN ON FIGURE.
STEP 5. REMOVE BUTTON PLUG (SHOWN ABOVE). REMOVE CAP AND TURN ADJUSTING SCREW ONE
TURN CLOCKWISE TO INCREASE SUPERHEAT 4 F. OR ONE TURN COUNTERCLOCKWISE TO
DECREASE SUPERHEAT. INSTALL CAP. INSTALL BUTTON PLUG.
ME 4120 -222 -14/5-13
AGO 20053A
50
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |