• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
16. On replacement main heat valve (Figure 2, Item 20)
MAINTAINER MAINTENANCE RECEIVER PRESSURE SOLENOID VALVE REPAIR, REPLACE

TECHNICAL MANUAL FOR MULTI-TEMPERATURE REFRIGERATED CONTAINER SYSTEM
Page Navigation
  618    619    620    621    622  623  624    625    626    627    628  
img
. . . . . .
TM 10-8145-222-23
0063
REPLACE CONTINUED
31. Install condenser (WP 0068, Install).
32. Reconnect electrical connector to valve coil (Figure 3, Item 1) if not already accomplished.
33. Perform evacuation and dehydration (WP 0014, Service).
34. Perform refrigerant leak check (WP 0014, Service).
35. Charge system with refrigerant (WP 0014, Service).
36. Start refrigeration unit and check for proper operation (TM 10-8415-222-10, Operating Procedures).
37. Install top-left panel (WP 0013, Install).
38. Install front panel assembly (WP 0013, Install).
39. Place MTRCS back into desired mode of operation (TM 10-8415-222-10, Operating Procedures).
END OF TASK
END OF WORK PACKAGE
0063-9/10 blank


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.