Replace either high pressure cutout switch, HP1 and HP2, as follows:
REPLACE ­ CONTINUED

TECHNICAL MANUAL FOR MULTI-TEMPERATURE REFRIGERATED CONTAINER SYSTEM
Page Navigation
  234    235    236    237    238  239  240    241    242    243    244  
img
.
TM 10-8145-222-23
0019
REPLACE CONTINUED
Figure 2. HP1 and HP2.
NOTE
It is necessary to verify replacement cutout switch settings before installing it.
Perform the high pressure switch test in accordance with instruction provided in this
WP before installing the switch.
10. Perform high pressure cutout switch test on new HP1 and HP2 in accordance with Test paragraph in this WP.
11. Install tested switch HP1 (Figure 2, Item 6) into tee (Figure 2, Item 4) and tighten 1/4-turn past hand tight.
12. Install tested switch HP2 (Figure 2, Item 2) into elbow (Figure 2, Item 3) and tighten 1/4-turn past hand tight.
0019-4