Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-4120-425-14&P
LIQUID SIGHT INDICATOR
DIRECT SUPPORT MAINTENANCE REPLACEMENT - Continued
0075-00
INSTALLATION
1.
With a steady flow of dry nitrogen through refrigeration system, braze liquid sight indicator onto condenser coil and
tubing (See WP 0050-00 and WP 0051-00).
2.
Install condenser coil assembly (See WP 0078-00).
3.
Install filter-drier (See WP 0066-00).
4.
Leak test refrigeration system (See WP 0052-00).
5.
Evacuate refrigerant system (See WP 0053-00).
6.
Charge refrigerant system (See WP 0054-00).
7.
Install rear top panel (See WP 0019-00).
END OF TASK
0075-00-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business